OUTPUT:
- Cross Border ICT system connection in ports (download)
Deliverables:
WPT1 - Intermodal transport soft measures
- Deliverable D.T1.1.1 Report on current situation in involved ports (download)
- Deliverable D.T1.2.1 Action plan for development of the ICT connection (download)
- Deliverable D.T1.3.1 Report on simulation of the connections between involved ports (download)
- Deliverable D.T1.4.1 Memorandum of Understanding - MoU (download)
WPT2 - Pilot projects
- Deliverable D.T2.1.1 Report on realization of pilot projects and development study (download)
- Deliverable D.T2.2.1 Pilot project no. 1 - Port of Bar (download)
- Deliverable D.T2.2.2 Pilot project no. 2 - ADSPMAM - (SASPA) (download)
- Deliverable D.T2.2.3 Pilot project no. 3 - Port of Durres (download)
- Deliverable D.T2.2.4 Pilot project no. 4 - AAST (download)
- Deliverable D.T2.2.5 Development study - Institute of Transport (download)
WPC – Communication
- Deliverable D.C.2.1 Brochure/leaflets
- Brochure 1 (download)
- Brochure 2 (download)